  • GENERAL SITE
  • MATTERS CONCERNING CARCASS STRUCTURE
  • GENERAL
  • MECHANICAL INSTALLATION AND ELECTRICAL INSTALLATION

GENERAL SITE

  1. Infrastructure works shall be performed concerning the supply of electric power in the quantity to meet the need of the site and feed lines shall be laid. Generators of capacity to provide uninterrupted power shall be placed for the block entrances, elevators, environmental lightening, floor halls, underground parking area, building’s water and fire storage hydrophores.
  1. Water shall be supplied to the apartments by hydrophore from stainless steel city water tanks.
  1. Telephone infrustructure for one number shall be built.
  1. During construction period, distribution of natural gas shall be made in the site.
  1. The apartments shall be heated by independent combi boiler, heating instalation shall be made, panel radiators shall be fixed in each room in accordance to the room sizes, dryier in the bathroom and natural gass meter shall be provided by Maqro Contstruction LLC.
  1. In-site roads, open car parking areas and closed car parking at -1 and -2 basements shall be made.
  1. In the project, fitness centre, children day nursery centre, basketball court, skateboarding rumps, treadmill around the green area and children’s playgrounds shall be constructed.
  1. Walls and/or grab rails shall surround the site, there shall be 2 entrance/exit point and security control installed at the points.
  1. Landscaping shall be made at the site.
  1. Intercom System shall be installed within the apartments.
  1. Atenna inlets shall be made at the units for the satelite broadcasting, cabling in living and sleeping room. Any asked broadcasting may be followed in case the customer provides the decoder or receiver.
  1. Cable inlets shall be made in the living rooms of the units in order to provide customers to possibility of have internet access.

MATTERS CONCERNING CARCASS STRUCTURE

  1. The buildings shall be reinforced concrete carcass. Construction technique is conventional formwork system.
  1. Exterior and interior walls shall be gass concrete blocks.
  1. Exterior faces shall be covered with tiles, conceptual panels.
  1. Roofs shall be terraced roof and water and heat insulation shall be made.
  1. External jacketing technique shall be used for the purpose of providing heat insulation.
  1. Styropor hall be used under cement finish on the floor slabs for the purpose of impact sound insulation.

GENERAL

BLOCK ENTRANCES

Floor slabs and steps shall be paved by marble, walls shall be plastic paint on gypsum plaster.

INTERNAL DOORS

Internal doors of the apartments shall be laminated wood. Customers are offered to chose the color by their taste.

EXTERNAL DOORS

Entry door of the apartments shall be steel door. 

JOINERY

Grey color joinery shall be PVC joinery and double glass of climat control solution shall be used. At least one window wing of “double opening mechanism” hinges.

FLOORING

Ceramic tiles shall be used.

WALL COATING

Satin gypsum plaste and plastic paint shall be applied.

CEILING COATING

Satin gypsum plaste and plastic paint shall be applied.

 

 

LIVING AND BEDROOMS

FLOORING

Laminated flooring shall be used, several samples will be provided to the customers to make a selection.

WALL COATING

Satin gypsum plaste and plastic paint shall be applied, several samples will be provided to the customers to make a selection.

CEILING COATING

Satin gypsum plaste and plastic paint shall be applied, several samples will be provided to the customers to make a selection.

 

KITCHEN

FLOORING

Ceramic tiles shall be used, several samples will be provided to the customers to make a selection.

KITCHEN CABINETS

Laminated/Glass/Lacquer coated cabinet doors, melamine coated chipboard cabinet body, laminated bench. Several color samples will be provided to the customers to make a selection .

ACCESSORIES

Kitchen’s appliances stove, oven and a range hood shall be installed and delivered in all apartments.

 

BATHROOM

FLOORING

Ceramic tiles shall be used, several samples will be provided to the customers to make a selection.

WALL COATING

Glazed tiles shall be used.

CEILING COATING

Satin gypsum plaste and plastic paint shall be applied.

IN BATHROOMS

Bathroom cupboard, built-in reservoir, acrylic bathtube or shower tray shall be made.

ACCESSORIES

Towel holder, toilet tissue holder, soap dish and hanger shall be installed and delivered in all bathrooms as accessory.

 

BALCONIES

FLOORING

Ceramic tiles shall be used.

WALL COATING

Silicon based exterior paint shall be made.

CEILING COATING

Silicon based exterior paintshall be made.

MECHANICAL INSTALLATION AND ELECTRICAL INSTALLATION

  1. One telephone wall plug and TV wall plug shall be installed within the apartment to the living room and master bedroom. At least 2 point of power wall plugs and light plugs shall be instaled in each room, as well as in the balcony.
  2. Electric, gas and watter metter shall be provided.
  3. One multi wall plug shall be applied at TV location of the living room.
  4. One chargable emergency lightening and fire exits shall be present at each floor landing within the   blocks.